Ames, IA

The University of Iowa Rec. Center

Having the option to adapt to evolving needs makes Cordeck’s In Floor Cellular Raceway System an obvious choice. Whether you just need to freshen up your equipment layout or make room for more, Cordeck’s In Floor Cellular Raceway System makes the transition smooth and uninterrupted. With so many students using the campus rec center daily, the ease of adding another point of power, data, or audiovisual makes the disruption to the flow of traffic minimal. The facility maintenance team is able to do all of the necessary work. Being able to have facility employees do the work cuts down on expensive labor bills. Not only is installing Cordeck’s raceway more economical, but it eliminates safety hazards. By having the power supply directly under the work out equipment, the excess power cords are no longer a tripping hazard.

Architect: RDG Planning and Design Des Moines, IA

Electrical Engineer: Henneman Engineering, Inc Iowa City, IA

General Contractor: Shaw-Lundquist Associates, Inc St. Paul, MN

Structural Engineer: Charles Saul Engineering, Inc Des Moines, IA

Cordeck System: N-R-G-FLOR® In Floor Cellular Raceway System. Visit our website for video introduction to Cordeck’s N-R-G-FLOR System. 877.857.6400 | 262.857.3000 cordeck.com


Back to top